Концентрический редуктор

сваренные баттом штуцеры трубы
June 03, 2025
Brief: Discover the Sch5-SCH160 Stainless Steel Butt Welded Fittings Sand Rolled SS Concentric Reducer, designed for seamless transitions in high-performance piping systems. Made from premium-grade stainless steel (304, 316, 316L), this reducer ensures optimal flow efficiency, corrosion resistance, and durability for industries like oil & gas, chemical processing, and water treatment.
Related Product Features:
  • Precision Flow Control: Concentric design maintains a uniform centerline, minimizing turbulence and pressure drop.
  • Robust Construction: Fabricated to ASME B16.9, ANSI, and ASTM standards for leak-proof, high-pressure performance.
  • Material Excellence: Available in SCH 10S, SCH 40, SCH 80, and custom schedules with optional surface treatments.
  • Wide Size Range: DN25 to DN800, catering to diverse industrial piping needs.
  • High Corrosion Resistance: Made from premium-grade stainless steel (304, 316, 316L) for long-lasting durability.
  • Versatile Applications: Ideal for oil & gas, chemical processing, power generation, and water treatment industries.
  • Customizable Options: Supports ASTM, DIN, EN, BS, JIS, and GOST standards with various surface treatments.
  • Immediate Availability: Extensive inventory ensures reduced lead times for critical projects.
Вопросы:
  • What materials are used in the Stainless Steel Butt Welded Concentric Reducer?
    The reducer is made from premium-grade stainless steel, including 304, 316, and 316L, ensuring exceptional corrosion resistance and durability.
  • What industries are these reducers suitable for?
    These reducers are ideal for high-performance applications in industries such as oil & gas, chemical processing, power generation, and water treatment.
  • Can I customize the reducer to meet specific project requirements?
    Yes, we offer customization options including various sizes, wall thicknesses, and surface treatments to meet ASTM, DIN, EN, BS, JIS, and GOST standards.
  • What is the lead time for orders?
    For in-stock items, the lead time is 5-10 days. For custom or out-of-stock items, it typically takes 15-20 days depending on the quantity.
Связанные видео

Трубопроводные фитинги 304/316L из нержавеющей стали

сваренные баттом штуцеры трубы
June 06, 2025

Соединительные муфты с резьбой из нержавеющей стали

Фитинги для труб из нержавеющей стали
June 30, 2025

304 316 Круглый сцепный орех из нержавеющей стали

Фитинги для труб из нержавеющей стали
June 30, 2025